福利彩票老快3开奖结果

航空翻译_飞行翻译_民航翻译_蓝天飞行翻译公司

承接2018年12月4日版本空客公务机 ACJ319 FCOM 和 QRH 翻译任务

时间:2018-12-14 09:44来源:蓝天飞行翻译公司 作者:公务机翻译 点击:

      承接2018年12月4日版本空客公务机ACJ319飞行机组操作手册(FCOM FLIGHT CREW OPERATING MANUAL)和快速检查单(QRH QUICK REFERENCE HANDBOOK)翻译任务 04 DEC 18 ACJ319 FLIGHT CREW OPERATING MANUAL and QRH QUICK REFERENCE HANDBOOK Translation

      2018年12月4日版本空客公务机ACJ319飞行手册主要牵扯到MSN从4位数升为5位数的改动。


ACJ319 FLIGHT CREW OPERATING MANUAL ACJ319 飞行机组操作手册

ACJ319 QUICK REFERENCE HANDBOOK ACJ319 快速检查单

      ACJ319飞行机组操作手册(FLIGHT CREW OPERATING MANUAL)的主要内容包含有:

FCOM - 04 DEC 18 - A319
Front Matter
Front Page
Transmittal Letter
Filing Instructions
List of Effective Sections/Subsections
Aircraft Allocation Table
List of Modifications
General Information
Aircraft Configuration Summary
If Installed Table
Main FCOM Changes
FCOM Purpose
List of Effective Sections/Subsections (LESS) - Paper ONLY
List of Effective Operations Engineering Bulletins (LEOEB)
List of Effective Documentary Units (LEDU) - Paper Only
List of Effective Temporary Documentary Units (LETDU) - PaperOnly
Aircraft Allocation Table (AAT) - Paper Only
List of Modifications (LOM) - Paper Only
FCOM Use and Organization
FCOM Format and Style Information - Paper only
FCOM Revisions
Abbreviations
Aircraft Systems
List of Effective Documentary Units...
List of Effective Temporary Documentary Units
Aircraft General
Overview Engines
Cockpit
Cabin
Cargo
Description
General Arrangement
Principal Dimensions
Unpressurized Compartments
Antenna Locations
Ground Service Connections and Panels
Ground Handling
Taxiing
degrees Turn on Runway
Ground Clearance Diagram
Ground Clearance Diagram
Landing Geometry
ILS/GLS (If Installed) /MLS (If Installed)  Final Approachand Landing Geometry
Minimum Visual GroundSegments (Flare Phase)
Visual Ground Geometry
Visual Ground Geometry
Air Conditioning / Pressurization / Ventilation
Air Conditioning General
Architecture
Main Components
Air Conditioning Pack
Pack Schematic (Simplified)
Pack Flow Control Valve
Emergency Ram Air
Mixer Unit
Hot-Air Pressure-Regulating Valve
Trim Air Valves
Temperature and Flow Regulation Temperature Regulation
Air Conditioning System Controllers
Cockpit - Electrical Heaters
System Operation under Failure Condition Air Conditioning System Controllers (If Installed)
Air Cycle Machine Failure
Hot Air Pressure Regulating Valve Failure

航空翻译 www.wffnw.tw
本文链接地址:承接2018年12月4日版本空客公务机 ACJ319 FCOM 和 QRH 翻译任务
福利彩票老快3开奖结果 波尔多葡萄园 老黑龙江时时彩走势图 银色雌狮4x走势图 百变王牌最新走势图百宝彩 富勒姆vs曼城直播 山东时时彩犯罪记录 陕西11选5开奖返奖 彩经网河内五分彩走势图 陕西快乐10分开奖直播现场 重庆时时彩开奖历史